Southside Library, Construction Progress, July/August, 2006 :




August 28   


The August 28th Architect's Field Report for the Southside Library mentions the following Work In Progress: "Wall insulation and lath is still being put on the building. Ducts are being run. Power is being installed. Steel framing is almost complete. Interior walls are being framed. The supply and return hot water runs for the heating system are being run. Masons are working on rock and block at the East Patio. Cameron has been installing backing for equipment in bathrooms and various locations within the building. Wet blown insulation is complete. Batt insulation is underway. Roofing for the electrical data room has been completed. Window frames are going in at the west and north walls. They are in place in the Children's west wall and the Multi-purpose west wall.

We are looking at a January, 2007, opening.

construction photo


August 28   


construction photo



August 7   


The August 7 Field Report from the architects for Southside Library includes the following Work in Progress: "Wall insulation and lath is being put on the building this week. Ducts are being run. Data runs are being installed. Power is being installed. Steel studs are being framed up. Interior walls are being framed. Steel erection at East Portal is underway. The supply and return hot water runs for the heating system are being run. Masons will be working on rock and block at the East Patio. Inspections in walls, ceilings, data, and electrical room for electrical rough-ins will occur this week. Afterwards, they will begin the insulation installation." Steel studs are being framed up. Interior walls are being framed.

We've read some of these items before, processes which can't be accomplished in a day, or a week. But we're still hoping for a December opening, which would make it 15 months from Groundbreaking. Not bad at all. construction photo


August 7   


construction photo



July 31   


"Work in progress: Wall insulation and lath is being put on the building this week. Ducts are being run. Data runs are being installed. Power is being installed. Steel studs are being framed up. Interior walls are being framed. Steel erection at East Portal is underway. The supply and return hot water runs for the heating system are being run. Masons will be working on rock and block at the East Patio. Cameron has been installing backing for equipment in bathrooms and various locations within the building. "Materials on site: Veneer masonry stone ; Rigid insulation under stucco ; CMU ; Roofing – EPDM / Perlite ; Steel framing ; Steel fence ; Sound attenuators ; Ducts ; Gypsum sheathing ; Batt insulation ; Glass block." construction photo


July 31   

construction photo



July 24   

The architects' Field Report for Southside Library on July 24th tells us: "Work in progress: Wall insulation and lath is being put on the building this week. Ducts are being run. Data runs are being installed. Power is being installed. Steel studs are being framed up. Interior walls are being framed. Roofers are working on detailing the EPDM roof. Z-furring and insulation as well as dry-in sheet have been built on the high entry roof. The supply and return hot water runs for the heating system are being run. Masons will be working on rock and block at the East Patio. Contractor has been installing backing for equipment in bathrooms and various locations within the building.

'Data runs', that we understand (yaay--the computers will need to be the first things in so that we can inventory those 80,000 items as they come in the door.) But, 'Z-furring'? Now, that's a mystery detail. :-) construction photo


July 24   

construction photo



July 10   


We might actually be on track for a December opening. The architects' Field Report for July 10, 2006, includes: "Work in progress: Wall insulation and lath is being put on the building this week. Ducts are being run. Data runs are being installed. Power is being installed. Steel studs are being framed up. Interior walls are being framed. Roofers are working on detailing the EPDM roof. The supply and return hot water runs for the heating system are being run." construction photo


July 10   


Interior walls? It sounds so imminent. Looks pretty real, too. We're starting to spend a lot of time talking about unloading and shelving those giant trucks full of materials. construction photo



July 5   


"East Patio bond beam has been poured. Perimeter slab insulation is ongoing. Wall insulation is being attached. Ductwork is ongoing. Steel studs are being finished up. Hydronic systems, water system piping is being installed. The majority of EPDM roof has been done. Metal roof areas have not been done." construction photo


July 5   


"Materials on site: Veneer masonry stone, Rigid insulation under stucco, CMU, Roofing – EPDM / Perlite, Steel framing, Steel fence, Sound attenuators, Ducts, Gypsum sheathing..." construction photo


July 5   

construction photo